Construction of Grade Control Structures in Pueblo and DP CanyonsCX(s) Applied: B6.1Date: 10/28/2009Location(s): Pueblo Canyon, New MexicoOffice(s): Los Alamos Site Office, NNSA-Headquarters
Office of NEPA Policy and Compliance
October 28, 2009CX(s) Applied: B6.1
Date: 10/28/2009
Location(s): Pueblo Canyon, New Mexico
Office(s): Los Alamos Site Office, NNSA-Headquarters
Installation of grade-control structures to reduce the potential for transport of low-level polychlorinated biphenyl contamination in the sediment deposits of the Pueblo and DP Canyon watersheds. The grade-control structures would result in reduced-flow velocities and peak discharge during flood events and should reduce erosion of contaminated deposits downstream of the structures.