Well Installations at R-Area Operable UnitCX(s) Applied: B3.1Date: 06/20/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Office of NEPA Policy and Compliance
June 20, 2011CX(s) Applied: B3.1
Date: 06/20/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office
Scope entails the installation of four groundwater monitoring wells at R Area in support of the Effectiveness Monitoring Plan for the R-Area Operable unit. Wells will be installed via Rotosonic drilling method to various depths. Two wells are planned for installation near the 105-R while the remaining two are located north of the R area.