Design, Procure, and Install a Dewatering Transfer Pump in Waste Tank 4, Riser 6, for Heel RemovalCX(s) Applied: B1.3Date: 07/22/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
July 22, 2011CX(s) Applied: B1.3
Date: 07/22/2011
Location(s): Aiken, South Carolina
Office(s): Savannah River Operations Office
Design and procure the dewatering pump that can be lowered to the tank bottom. Design a pump assembly to replace the current assembly from the pump to the transfer nozzle. Replace the current assembly with the new assembly.