R-Normal River Water LineCX(s) Applied: B1.3Date: 08/10/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations OfficeR-Normal River Water LineCX(s) Applied: B1.3Date: 08/10/2011Location(s): Aiken, South CarolinaOffice(s): Savannah R...
Office of NEPA Policy and Compliance
August 10, 2011CX(s) Applied: B1.3
Date: 08/10/2011
Location(s): Aiken, South Carolina
Office(s): Savannah River Operations Office
Operation of the Site's river water distribution system (R-Normal line) is required to provide water to support the 200 Area replacement biomass cogeneration facility. Returning the R-Normal line to normal service will require routine purging of stagnant water exhibiting high pH as a result of low or no flow conditions in the line. Savannah River Site plans to drain a portion of the R-Normal river water line in a strategic manner to remove/purge the high pH water from the line without contravening water quality requirements.