CX-006607: Categorical Exclusion Determination

Big Hill Cavern 105B Wellhead ReconfigurationCX(s) Applied: B5.12Date: 08/15/2011Location(s): Winnie, TexasOffice(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

August 15, 2011
Estimated Read Time   min
Big Hill Cavern 105B Wellhead Reconfiguration
CX(s) Applied: B5.12
Date: 08/15/2011
Location(s): Winnie, Texas
Office(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all labor, tools, materials, equipment, and supervision needed to perform Big Hill Cavern 105B wellhead reconfiguration. Tasks included de-piping the wellhead, removing piping and instrumentation with the footprint of the workover equipment prior to workover and after a new liner wellhead is installed, cut, fit, weld, hydrotest and install piping between the first flange off the wellhead and the wellhead, reinstall wellhead instrumentation and paint the new piping.