Tualatin Hills Park and Recreation District Request for Use of Right-Of-Way for Westside TrailCX(s) Applied: B4.9Date: 08/25/2011Location(s): Beaverton, OregonOffice(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
August 25, 2011CX(s) Applied: B4.9
Date: 08/25/2011
Location(s): Beaverton, Oregon
Office(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to grant a request submitted by Tualatin Hills Park and Recreation District (THPRD) to construct portions of their proposed regional trail on existing BPA transmission line right-of-way (ROW) in the City of Beaverton, Oregon. THPRD?s trail sections would be located on portions of existing BPA fee-owned right-of-way property along the BPA Keeler-Oregon City No. 2 and Oregon City Stub 115-kilovolt transmission line corridors, as well as adjacent non-BPA utility right-of-way. THPRD is responsible for satisfying all Federal, State and local permitting and environmental requirements relating to planning, construction, and maintenance of their proposed trail.