Categorical Exclusion Determination
Office of NEPA Policy and Compliance
October 18, 2017The Power Management organization at Idaho National Laboratory (INL) needs to test and possibly treat power poles and structures, replace poles and structures in poor condition, and inspect and potentially replace other components (e.g., anchors, insulators, cross-arms, wire, etc.) associated with the power distribution system at the INL Site.