CX-016390: Kennewick Tap Upgrades

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

March 6, 2017
Estimated Read Time   min

Bonneville Power Administration is proposing to upgrade three transmission line structures—two on the Franklin-Badger Canyon Number 2 line and one on the Kennewick Tap to Franklin-Badger Canyon Number 2 line in Kennewick, Washington. The upgrades are needed to provide reliability and to provide for line maintenance without de-energizing local utility service.