CX-016642: Ross-Lexington No. 1 Transmission Structure Inspections

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

April 24, 2017
Estimated Read Time   min

Bonneville Power Administration is proposing to conduct an inspection of transmission tower steel lattice legs and concrete footings at 187 towers of the Ross-Lexington No. 1 230 kilovolt transmission line.