CX-016143: Spokane Tribal Hatchery Modernization

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

January 3, 2017
Estimated Read Time   min

Bonneville Power Administration (BPA) proposes to fund the installation of a new outdoor tank area, construction of four new 30-foot diameter dual drain circular tanks, a pre-engineered metal roof cover over the tanks that is enclosed with predator barriers, water supply and drain piping, water aeration equipment, a low pressure air blower and delivery system, aero boost water recirculation equipment, instrumentation, and associated electrical power, lighting, and outlets to facilitate tank operation.