Categorical Exclusion Determination
Office of NEPA Policy and Compliance
January 26, 2017The Western Area Power Administration is proposing to repair access roads, replace insulators, and perform pad work from Structure 223/5 to Structure 237/1 along the Liberty-Peacock transmission line corridor. The proposed work is needed to maintain the reliability and safety of the bulk electrical system.