June 26, 2017FTLB Fume Hood Abatement and Replacement
Award Number: DE-AC36-08GO28308
CX(s) Applied: B1.16, DOE/EA-1968
National Renewable Energy Laboratory (NREL)
Location(s): CO
Office(s): Golden Field Office
The U.S. Department of Energy (DOE) is proposing to provide funding to the National Renewable Energy Laboratory (NREL) to remove and replace 19 chemical hoods at the South Table Mountain (STM) campus Field Test Laboratory Building (FTLB). Of the 19 hoods, 5 would require special handling measures.
Three of the chemical hoods have asbestos-containing cement board liners. An experienced and licensed abatement contractor would remove the liners and collect them in sealed, labeled, impermeable bags or containers and dispose of them appropriately. All asbestos abatement work would be done in strict compliance with NREL, EPA, OSHA, and State of Colorado requirements.