EA-1744: Final Environmental Assessment

Brea Power II, LLC's Olinda Combined Cycle Electric Generating Plant Fueled By Waste Landfill Gas, Brea, California

Office of NEPA Policy and Compliance

October 2, 2010
minute read time

Brea Power II, LLC's Olinda Combined Cycle Electric Generating Plant Fueled By Waste Landfill Gas; Brea, California

DOE issued a final EA that analyzes the potential environmental impacts of awarding a federal grant to Brea Power II, LLC to facilitate modification and expansion of an existing landfill gas collection system and construction and operation of a combined cycle power facility at the Olinda Alpha Landfill in Brea, California.

For more information, see Brea Power II, LLC's Olinda Combined Cycle Electric Generating Plant Fueled By Waste Landfill Gas.

  • DOE prepared this EA to evaluate the potential environmental consequences of providing an American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111- 5, 123 Stat.115) financial assistance grant to Brea Power II, LLC (Brea Power; formerly Ridgewood Renewable Power, LLC). The grant would facilitate expansion of an existing landfill gas collection system, and construction and operation of a combined cycle power generation facility at the Olinda Alpha Landfill in Brea, California.

    DOE’s proposed action is to provide $10 million in financial assistance in a cost-sharing arrangement with the project proponent, Brea Power. The cost of the project is estimated to be about $84 million. The primary objective of Brea Power’s proposed project is to maximize the productive use of substantial quantities of waste landfill gas generated and collected at the Olinda Alpha Landfill in Brea, California. The project proponent determined that utilization of the waste gas for power generation in a combustion turbine combined cycle facility was the best use for the gas. The electricity generated from the proposed project, a net output of approximately 280 kilowatt-hours of electricity annually, would be distributed to the local power grid via a new electric transmission line to be installed by the local utility company. Brea Power would expand the existing gas collection system at the landfill and build the new gas-to-energy facility across the street from the existing gas-to-energy facility. Once the new facility is operational, the existing facility would be used only as a contingency.