Building 2 Air Conditioning Unit 2 Replacement CX(s) Applied: B1.3, B1.16, B2.1, B2.2Date: 09/12/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
September 12, 2016Building 2 Air Conditioning Unit 2 Replacement
CX(s) Applied: B1.3, B1.16, B2.1, B2.2
Date: 09/12/2016
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory
Removal and replacement of the old Air Conditioning Unit (ACU) and condensing units from the roof. Work will include ductwork, insulation, piping, heating, ventilation and air conditioning controls, electrical, and cutting/patching work.