CX-015833: Categorical Exclusion Determination

Wallace Road and B-922 Parking Lot Erosion Control Project CX(s) Applied: B1.3Date: 09/12/2016 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory

Office of NEPA Policy and Compliance

September 12, 2016
Estimated Read Time   min

Wallace Road and B-922 Parking Lot Erosion Control Project
CX(s) Applied: B1.3
Date: 09/12/2016
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory

Fill in gaps under security fence with clean fill and install rip rap to prevent further erosion of hillside next to Wallace Road and install a rock gutter on the south end of B-922 parking lot.

Document(s) Available for Download