CX-015765: Categorical Exclusion Determination

Door Improvements at Columbia Control House and NERC-CIP Upgrades CX(s) Applied: B1.3Date: 09/13/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

September 13, 2016
Estimated Read Time   min

Door Improvements at Columbia Control House and NERC-CIP Upgrades
CX(s) Applied: B1.3
Date: 09/13/2016
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to perform North American Electric Reliability Corporation’s Critical Infrastructure Protection (NERC-CIP) upgrades to the front door of the Columbia Substation control house.

Document(s) Available for Download