Mossyrock-Chehalis No. 1 Impairment Rectification CX(s) Applied: B1.3Date: 09/16/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 16, 2016Mossyrock-Chehalis No. 1 Impairment Rectification
CX(s) Applied: B1.3
Date: 09/16/2016
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to address transmission line clearance impairments at multiple locations (see table below) along the Mossyrock-Chehalis No. 1 transmission line.