CX-015764: Categorical Exclusion Determination

Mossyrock-Chehalis No. 1 Impairment Rectification CX(s) Applied: B1.3Date: 09/16/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

September 16, 2016
Estimated Read Time   min

Mossyrock-Chehalis No. 1 Impairment Rectification
CX(s) Applied: B1.3
Date: 09/16/2016
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) is proposing to address transmission line clearance impairments at multiple locations (see table below) along the Mossyrock-Chehalis No. 1 transmission line.