Noxon-Hot Springs Structure 17/1 Foundation Stabilization CX(s) Applied: B1.3Date: 09/28/2016 Location(s): MontanaOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 28, 2016Noxon-Hot Springs Structure 17/1 Foundation Stabilization
CX(s) Applied: B1.3
Date: 09/28/2016
Location(s): Montana
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to install a riprap filled trench between the Noxon Hot Springs structure 17/1 and the encroaching Beaver Creek.