Black Canyon-Emmett No. 1 Transmission Line Title Transfer CX(s) Applied: B1.24Date: 09/29/2016 Location(s): IdahoOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 29, 2016Black Canyon-Emmett No. 1 Transmission Line Title Transfer
CX(s) Applied: B1.24
Date: 09/29/2016
Location(s): Idaho
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to transfer ownership of its Black Canyon-Emmett No. 1 69-kilovolt (kV) Transmission Line to the US Bureau of Reclamation (USBR).