Pomeroy Substation Upgrades CX(s) Applied: B4.11Date: 10/27/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
October 27, 2016Pomeroy Substation Upgrades
CX(s) Applied: B4.11
Date: 10/27/2016
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to upgrade equipment, replace the telephone system, and install a Power Control Assembly (PCA) at its Pomeroy Substation located in Garfield County, Washington.