CX-015703: Categorical Exclusion Determination

Automatic ultrasonic testing (AUT) Survey for 48 inch Big Hill (BH) Brine Disposal Pipeline CX(s) Applied: B1.3Date: 08/24/2016 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

August 24, 2016
Estimated Read Time   min

Automatic ultrasonic testing (AUT) Survey for 48 inch Big Hill (BH) Brine Disposal Pipeline
CX(s) Applied: B1.3
Date: 08/24/2016
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all supervision, transportation, labor, materials and equipment to excavate and inspect at two locations on the 48-inch Big Hill Brine Disposal Pipeline.

Document(s) Available for Download