Boiler Blowdown Tank Project CX(s) Applied: B1.5, B1.15, B1.23, B2.5Date: 07/13/2016 Location(s): New YorkOffices(s): Naval Nuclear Propulsion Program
Office of NEPA Policy and Compliance
July 13, 2016Boiler Blowdown Tank Project
CX(s) Applied: B1.5, B1.15, B1.23, B2.5
Date: 07/13/2016
Location(s): New York
Offices(s): Naval Nuclear Propulsion Program
The scope of the Kesselring Site Boiler Slowdown Tank Project consists of: (1) Excavation and removal of an existing 60 year-old 450 gallon Slowdown Tank; (2) Construction of an approximately 275 square foot building at the location of the existing old tank; and (3) Installation of a new 650 gallon Slowdown Tank system within the new building.