Advanced Test Reactor (ATR) Fuel Oil Leak Excavation and Cleanup CX(s) Applied: B6.1Date: 07/20/2016 Location(s): IdahoOffices(s): Nuclear Energy
Office of NEPA Policy and Compliance
July 20, 2016Advanced Test Reactor (ATR) Fuel Oil Leak Excavation and Cleanup
CX(s) Applied: B6.1
Date: 07/20/2016
Location(s): Idaho
Offices(s): Nuclear Energy
The purpose of this revision is to expand the project scope to include asbestos disturbance and removal from the fuel line between Test Reactor Area (TRA)-627 and TRA-670.