CX-015608: Categorical Exclusion Determination

Materials and Fuels Complex (MFC)-752 Analytical Laboratory Installation of Air Conditioning Units CX(s) Applied: B2.1Date: 08/04/2016 Location(s): IdahoOffices(s): Nuclear Energy

Office of NEPA Policy and Compliance

August 4, 2016
Estimated Read Time   min

Materials and Fuels Complex (MFC)-752 Analytical Laboratory Installation of Air Conditioning Units
CX(s) Applied: B2.1
Date: 08/04/2016
Location(s): Idaho
Offices(s): Nuclear Energy

There is insufficient cooling in rooms B102, B103 and B116 in the Materials and Fuels Complex (MFC) building 752AL. The proposed action would install individual air conditioning (AC) units in each room to provide additional cooling and maintain desired temperature.