Green Bluff Tap/Bell-Trentwood No. 2 (Structure 7/5) Access Road Repair Project CX(s) Applied: B1.3Date: 07/20/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
July 20, 2016Green Bluff Tap/Bell-Trentwood No. 2 (Structure 7/5) Access Road Repair Project
CX(s) Applied: B1.3
Date: 07/20/2016
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to repair approximately 104 linear feet of access road and restore two 25-feet by 25-feet landings on the Green Bluff Tap/Bell-Trentwood No. 2 Line.