Roadway Pavement Installation from Gate 16 to TRU Pad 6 CX(s) Applied: B1.3Date: 42541 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
June 20, 2016Roadway Pavement Installation from Gate 16 to TRU Pad 6
CX(s) Applied: B1.3
Date: 42541
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Pavement Installation from Gate 16 to TRU Pad 6. This installation will replace the gravel road with pavement.