June 8, 2016Chief Joseph-Monroe No. 1 Transmission Line Verizon Wireless Proposed Projects
CX(s) Applied: B1.3
Date: 42529
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to perform maintenance on approximately 1,000 feet of the access road to Chief Joseph-Monroe No. 1, Structure 86/2.