Rocky Reach-Maple Valley No. 1 Footing Repair and Access Road Improvement Project: Structures 95/2, 95/3, 95/4, and 99/1 CX(s) Applied: B1.3Date: 42531 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
June 10, 2016Rocky Reach-Maple Valley No. 1 Footing Repair and Access Road Improvement Project: Structures 95/2, 95/3, 95/4, and 99/1
CX(s) Applied: B1.3
Date: 42531
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to pour concrete caps to reinforce the crumbling footings of structures 95/2, 95/3, 95/4, and 99/1.