Reedsport Substation Outfall Redesign CX(s) Applied: B1.6Date: 42562 Location(s): OregonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
July 11, 2016Reedsport Substation Outfall Redesign
CX(s) Applied: B1.6
Date: 42562
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to decommission two of three existing outfalls at the Reedsport Substation and route all runoff to the remaining outfall location at the easternmost edge of the site.