CX-015226: Categorical Exclusion Determination

Canon West Midway 230 Kilovolt Transmission Line Fiber Optic Addition Fremont County CX(s) Applied: B4.7Date: 01/15/2016 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

Office of NEPA Policy and Compliance

January 15, 2016
Estimated Read Time   min

Canon West Midway 230 Kilovolt Transmission Line Fiber Optic Addition Fremont County
CX(s) Applied: B4.7
Date: 01/15/2016
Location(s): Colorado
Offices(s): Western Area Power Administration-Rocky Mountain Region

Western Area Power Administration (WAPA) proposes to install a 48-count overhead fiber optic ground wire on the existing transmission line. Joint project between Tri-State Generation and Transmission Association, Inc., and Western.