288-F Ash Basin Landfill Ash Reclamation Phase 2 CX(s) Applied: B6.1Date: 05/02/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
May 2, 2016288-F Ash Basin Landfill Ash Reclamation Phase 2
CX(s) Applied: B6.1
Date: 05/02/2016
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The Phase Two scope installs the necessary erosion control features that will allow for ash (about 170,000 cu. yds.) deposited around the basin to be excavated and placed within the landfill boundary (about 6.8 acres) and allow for eventual landfill closure.