CX-015169: Categorical Exclusion Determination

Installation of a 480-volt Electrical Line CX(s) Applied: B4.12Date: 03/21/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

March 21, 2016
Estimated Read Time   min

Installation of a 480-volt Electrical Line
CX(s) Applied: B4.12
Date: 03/21/2016
Location(s): South Carolina
Offices(s): Savannah River Operations Office

CB&I MOX Services proposes to install a 480-volt electrical line, beginning at 211-44F and ending at a WISE Services laydown yard located southeast of 211-44F. The first 90 feet will be installed above ground in rigid conduit. At the 90-foot point the line will split to the southeast and southwest for approximately 144 feet and 100 feet, respectively. The southeast and southwest splits will be buried 18-24 inches underground in rigid conduit and capped with concrete.