Subcontractor to Repair SRS Railroad System CX(s) Applied: B1.3Date: 04/19/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
April 19, 2016Subcontractor to Repair SRS Railroad System
CX(s) Applied: B1.3
Date: 04/19/2016
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Subcontractor (Queen City Railroad Construction) is to repair “non-functional” crossing signals and perform annual preventive maintenance/inspections on all crossing signals.