CX-015122: Categorical Exclusion Determination

Test Fire Pump Through Fire Hydrants CX(s) Applied: B1.3Date: 04/27/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

April 27, 2016
Estimated Read Time   min

Test Fire Pump Through Fire Hydrants
CX(s) Applied: B1.3
Date: 04/27/2016
Location(s): South Carolina
Offices(s): Savannah River Operations Office

Pump 225,000 gallons of fire water out of Fire Hydrants 3033 and 3074 to perform an Acceptance Test of the new Electric Fire Pump Controller.

Document(s) Available for Download