Replace WHT-1 Flush Water and WHT-10 Seal Flush Tanks GFP (WH-MM-1100A) CX(s) Applied: B1.3Date: 03/22/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
March 22, 2016Replace WHT-1 Flush Water and WHT-10 Seal Flush Tanks GFP (WH-MM-1100A)
CX(s) Applied: B1.3
Date: 03/22/2016
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, equipment, materials, services, transportation, storage, and supervision required to manufacture, test, and prepare four new 750 barrel reinforced fiberglass tanks (new WHT-1A, WHT-1B, WHT-1C,and WHT-10 tanks), which will replace the two existing WHT-1 and WHT-10 tanks. Installation of these four new WH tanks will be performed by others under WH-MM-1100.