CX-015109: Categorical Exclusion Determination

Replace Section of 36-inch Crude Oil Pipeline at Hillebrand at Bayou (BH-MM-756) CX(s) Applied: B5.4Date: 06/13/2016 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

June 13, 2016
Estimated Read Time   min

Replace Section of 36-inch Crude Oil Pipeline at Hillebrand at Bayou (BH-MM-756)
CX(s) Applied: B5.4
Date: 06/13/2016
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall furnish all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision required to replace the corroded segment of 36” Big Hill (BH) Crude Oil Pipeline crossing beneath Hillebrandt Bayou within the existing 50’ pipeline right-of-way. Piping will be provided to the subcontractor as Government Furnished Property (GFP) under BH-MM-756A. This project does not include any Government Salvage.