CX-015078: Categorical Exclusion Determination

Intelligent BOP RAM Actuation Sensor System (Project Modifications) CX(s) Applied: A9, B3.6Date: 03/23/2016 Location(s): TexasOffices(s): National Energy Technology Laboratory

Office of NEPA Policy and Compliance

March 23, 2016
Estimated Read Time   min

Intelligent BOP RAM Actuation Sensor System (Project Modifications)
CX(s) Applied: A9, B3.6
Date: 03/23/2016
Location(s): Texas
Offices(s): National Energy Technology Laboratory

Eval sensing approaches for instr. BOPs (blow out preventer), design, build, and test prototype sensing sys,dev land-based rig-test ready software and electronics and perform preliminary product assessment

Document(s) Available for Download