Windwave Fiber Installation at Big Eddy Substation CX(s) Applied: B4.7Date: 02/25/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
February 25, 2016Windwave Fiber Installation at Big Eddy Substation
CX(s) Applied: B4.7
Date: 02/25/2016
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to allow WindWave Technologies, Inc. (WindWave) to directionally drill an underground fiber route from a new customer vault to an existing BPA customer vault on BPA fee-owned right-of-way.