Pole Replacements on the Cougar-Thurston #1 Transmission Line Corridor CX(s) Applied: B1.3Date: 03/18/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
March 18, 2016Pole Replacements on the Cougar-Thurston #1 Transmission Line Corridor
CX(s) Applied: B1.3
Date: 03/18/2016
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to perform in-kind replacement of 11 wood pole structures along the Cougar-Thurston #1 transmission line corridor.