CX-015006: Categorical Exclusion Determination

Big Eddy-Redmond Transmission Wood Pole Replacement CX(s) Applied: B1.3Date: 04/12/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

April 12, 2016
Estimated Read Time   min

Big Eddy-Redmond Transmission Wood Pole Replacement 
CX(s) Applied: B1.3
Date: 04/12/2016
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to replace deteriorating wood-pole structures (including, cross arms, insulators, guy anchors, etc.).

Document(s) Available for Download