CX-015005: Categorical Exclusion Determination

Marion-Alvey Transmission Line Mile 1-43 Access Road Upgrade Project CX(s) Applied: B1.3Date: 04/14/2016 Location(s): OregonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

April 14, 2016
Estimated Read Time   min

Marion-Alvey Transmission Line Mile 1-43 Access Road Upgrade Project
CX(s) Applied: B1.3
Date: 04/14/2016
Location(s): Oregon
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) is proposing to improve approximately 35.3 miles of access road between miles 1 and 43 along the Marion-Alvey No. 1 500 kilovolt (kV transmission line that are in need of maintenance.

Document(s) Available for Download