Hat Rock Substation Upgrades CX(s) Applied: B4.1Date: 04/22/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
April 22, 2016Hat Rock Substation Upgrades
CX(s) Applied: B4.1
Date: 04/22/2016
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to upgrade equipment and install a Power Control Assembly (PCA) at its Hat Rock Substation, located in Umatilla County, Oregon.