Dredging of Bryan Mound Raw Water Intake Structure Inlet Channel CX(s) Applied: B1.3Date: 09/28/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

September 28, 2015
Estimated Read Time   min

Dredging of Bryan Mound Raw Water Intake Structure Inlet Channel
CX(s) Applied: B1.3
Date: 09/28/2015
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all labor, supervision, transportation, equipment, tools, services and supplies required to dredge the intake channel at the Bryan Mound (BM) SPR site. An estimated 5,500 cubic yards of silt and debris will be removed by mechanical dredge method to clear the intake approach of the BM Raw Water Intake Structure. Dredged materials will be disposed on-site in the U.S. Corps of Engineers (COE) approved diked upland (extension) area as authorized in the existing site COE permit.