Lower Level Guard Post Replacement Project CX(s) Applied: B1.11, B1.15, B2.2Date: 09/25/2015 Location(s): New YorkOffices(s): Naval Nuclear Propulsion Program
Office of NEPA Policy and Compliance
September 25, 2015Lower Level Guard Post Replacement Project
CX(s) Applied: B1.11, B1.15, B2.2
Date: 09/25/2015
Location(s): New York
Offices(s): Naval Nuclear Propulsion Program
This project will replace the lower level guardhouse. A prefabricated steel structure will be placed on a concrete pad on the south side of the access road, directly across from the existing post.