SMUD Resilient Grid Initiative CX(s) Applied: A9, A11, B3.6, B4.4, B4.6Date: 09/03/2015 Location(s): CaliforniaOffices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
September 3, 2015SMUD Resilient Grid Initiative
CX(s) Applied: A9, A11, B3.6, B4.4, B4.6
Date: 09/03/2015
Location(s): California
Offices(s): National Energy Technology Laboratory
Install SCADA switches on 69 kilovolt circuits for automatic sectionalizing and fault location and install secondary power regulators (SPR) to allow remote voltage management of the distribution grid.