CX-014290: Categorical Exclusion Determination

Replace Bryan Mound Crude Oil Closed Drain System at Meter Skid (BM-MM-805) CX(s) Applied: B1.3Date: 08/31/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

August 31, 2015
Estimated Read Time   min
Replace Bryan Mound Crude Oil Closed Drain System at Meter Skid (BM-MM-805)
CX(s) Applied: B1.3
Date: 08/31/2015
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all labor, supervision, materials, equipment, and tools required to replace the BM Crude Oil Drain System at the Meter Skid. Subcontractor shall return all 2” valves to the Government after removal as salvaged property.