Resilient DC Microgrid Solution for REDI CX(s) Applied: A1, A9, B1.7, B4.4Date: 09/14/2015 Location(s): ColoradoOffices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
September 14, 2015Resilient DC Microgrid Solution for REDI
CX(s) Applied: A1, A9, B1.7, B4.4
Date: 09/14/2015
Location(s): Colorado
Offices(s): National Energy Technology Laboratory
This project will convert the treatment plant's major motor loads (250 hp motors connected to the water pumps) to operate directly on DC, along with grid-scale electric storage to support the pumps.