CX-014163: Categorical Exclusion Determination

Drainage Improvements East of Engineered Trench 2 Along Existing E-Area Perimeter CX(s) Applied: B1.3Date: 06/09/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

June 9, 2015
Estimated Read Time   min

Drainage Improvements East of Engineered Trench 2 Along Existing E-Area Perimeter
CX(s) Applied: B1.3
Date: 06/09/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office

Drainage E of Engineered Trench (ET) 2 along the existing E-Area perimeter drainage ditch erodes when the sump from ET 2 is pumped out. This erosion also impedes traffic access along the perimeter of the area.

Document(s) Available for Download