Unneeded Materials and Chemicals Clean-out Project CX(s) Applied: B1.3Date: 03/15/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Office of NEPA Policy and Compliance
March 15, 2012Unneeded Materials and Chemicals Clean-out Project
CX(s) Applied: B1.3
Date: 03/15/2012
Location(s): Tennessee
Offices(s): Y-12 Site Office
The proposed action is to remove and disposition thirty-seven pieces of equipment that have been identified as unused materials and chemicals UMCs) from a designated building.
CX(s) Applied: B1.3
Date: 03/15/2012
Location(s): Tennessee
Offices(s): Y-12 Site Office
The proposed action is to remove and disposition thirty-seven pieces of equipment that have been identified as unused materials and chemicals UMCs) from a designated building.