CX-014380: Categorical Exclusion Determination

Chief Joseph-Foster Creek Underground Fiber Optic Cable Installation (update to previous CX issued September 14, 2015) CX(s) Applied: B4.7Date: 10/26/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

October 26, 2015
Estimated Read Time   min
Chief Joseph-Foster Creek Underground Fiber Optic Cable Installation (update to previous CX issued September 14, 2015)
CX(s) Applied: B4.7
Date: 10/26/2015
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to install underground fiber optic cable between BPA’s Chief Joseph Substation and Douglas County Public Utility District’s Foster Creek Substation.